A DEM, before it can be used for watershed delineation, often needs to be reconditioned and pre-processed by “filling” any depressions or sinks (an area lower than its surroundings) to…
A DEM, before it can be used for watershed delineation, often needs to be reconditioned and pre-processed by “filling” any depressions or sinks (an area lower than its surroundings) to…
Head Losses (or energy losses) associated with conduits in a storm sewer system include pipe friction losses and minor losses. Pipe friction losses are normally solved by Manning's equation, while…